Skip to main content
Navy Strikes

Installation help

In this order your darts corner is up within an hour: board → surround → lighting → mat.

1. Hang the dartboard

Bullseye at 1.73 metres, throw line at 2.37 metres. The complete step-by-step plan with check measurements is in the guide Hanging a dartboard.

2. Fit the surround ring

No tools needed: click the PU rubber segments around the hanging board. The ring clamps itself in place and catches every miss from that moment on.

3. Connect the LED lighting

Click the LED ring around the board or the surround, route the 3-metre cable along the wall to the socket and set your brightness with the dimmer. Tip: also read how to prevent shadow on the board.

4. Lay down the dart mat

Roll out the mat with the board side against the wall, and the oche is automatically at the official distance of 2.37 metres.

Stuck somewhere?

Email info@navystrikes.nl; we help you step by step, with photos or a short video if needed.